Sunday, May 6, 2012

We are hiring: Electrical Engineers - Nuke Experience!

We are hiring  3 Electrical Engineers! Want to be an Ethernaut? Want to be a "Rockstar"

May 04, 2012
 
General:
Require Modification experience, especially functioning as the Responsible Engineer (RE) for preparing and issuing Modification Packages.  Needs to be experienced in all aspects including Package Preparation, identifying Design Inputs, Design Checklist, Master Equipment Database and Master Parts List Database, Critical Parameters, Pre-Installation and Post Installation Testing, Installation Instructions, writing Technical Justifications, Affected Documents, Affected Databases, identifying Special/Interdisciplinary/Plant Impact Reviews, preparing 10CFR50.59 Screens, Design Verification, preparing Requisitions and Purchase Orders, preparing License Document Changes, reviewing and applying Operating Experience, performing Project Kick-Off Meetings, performing Design Review Meetings, scheduling, supporting Field Engineering and Work Planning, and working with a Condition Reporting system.  Must be computer (PC) literate and capable of using basic software such as Word, Excel, and Powerpoint.  Must be capable of performing with little oversight.
Requires functional knowledge of Cable routing, sizing and application, raceway installation and specification, separation requirements, sizing and application of breakers, fuses, and other basic electrical components and systems, lighting, distribution panels, UPSs, Inverters/Battery Chargers, transformers, MCCs, Switchgear, etc.  Preferable to have knowledge of ETAP or other Electrical System Analysis type software.  Knowledge of typical UFSAR Electrical section information and how to research and use the information.  Understanding of system requirements including LOOP and Station Blackout and the impacts/requirements of the Electrical System.  Understanding of all Electrical Calculations typically required at Nuclear Stations (Combustible Loading, Appendix R, Heat Loading, Ampacity, Protection Sizing, Equipment Qualification, Raceway Sizing, UPS sizing, Battery Sizing, Setpoint calculations, Uncertainties, Databases such as Setpoints, Fuses and Relays, etc.)
Email: michael@ethernautics.com

No comments:

Post a Comment